In power management, the controllers have the information that they need to automatically start, stop, connect, and disconnect generators and/or mains. See Power management for more information.
Island operation in power management
Power plant with synchronising generators. Can also be used in critical power plants with a start signal from an external (ATS) controller.
Gensets in power management with three mains and two sections
Using Ethernet backup for power management
AGC 150 in power management with solar and battery controllers
Note: You can use AGC 150 generator, mains, and bus tie breaker controllers for
power management in a hybrid system. However, the AGC 150 genset hybrid controller
cannot be used in a power management application. To control the photovoltaic (PV) power
source(s), use ASC 150 Solar.